Selection context
Define the project before choosing a configuration.
The fastest route to a useful trench grating quotation is a dimensioned opening plus the actual traffic and support conditions. A sketch or drawing helps prevent confusion about clear span and bearing direction.
Opening width, length and clear span
Include this information in the drawing or enquiry so it can be reviewed with the complete application.
Pedestrian, vehicle or equipment traffic
Include this information in the drawing or enquiry so it can be reviewed with the complete application.
Frame, support and installation level
Include this information in the drawing or enquiry so it can be reviewed with the complete application.
Surface, fixing, quantity and destination
Include this information in the drawing or enquiry so it can be reviewed with the complete application.
Information to include
| Input | What to provide | Why it matters |
|---|---|---|
| Opening | Clear width, length and support detail | Defines panel size and clear span. |
| Traffic | Pedestrian, vehicle, forklift or equipment information | Sets the load case for technical review. |
| Configuration | Bars, spacing, surface, frame and fixing if specified | Prevents assumptions and quotation mismatch. |
| Project | Quantity, destination, drawing and required standard | Supports fabrication and delivery review. |
Request a project quotation
Send the opening, support, traffic, finish, quantity and any drawing or standard requirement. We can discuss the configuration against your project details.
