Selection context
Define the project before choosing a configuration.
Find practical answers to the questions commonly asked when selecting, specifying and ordering trench cover grating and steel grating.
How do I measure the trench opening?
Include this information in the drawing or enquiry so it can be reviewed with the complete application.
Which direction should the bearing bars run?
Include this information in the drawing or enquiry so it can be reviewed with the complete application.
What information is needed for a quote?
Include this information in the drawing or enquiry so it can be reviewed with the complete application.
When is a supporting frame required?
Include this information in the drawing or enquiry so it can be reviewed with the complete application.
Information to include
| Input | What to provide | Why it matters |
|---|---|---|
| Opening | Clear width, length and support detail | Defines panel size and clear span. |
| Traffic | Pedestrian, vehicle, forklift or equipment information | Sets the load case for technical review. |
| Configuration | Bars, spacing, surface, frame and fixing if specified | Prevents assumptions and quotation mismatch. |
| Project | Quantity, destination, drawing and required standard | Supports fabrication and delivery review. |
Request a project quotation
Send the opening, support, traffic, finish, quantity and any drawing or standard requirement. We can discuss the configuration against your project details.
